Renewal work is at present being carried out on the Christchurch-Ly tteirailway line. On the section from Wilson’s Road to the Opawa station the 701 b rails on the track from Lyttelton to Christchurch are being replaced with 1001 b rails and the sleepers renewed.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19340412.2.167
Bibliographic details
Star (Christchurch), Volume LXVI, Issue 20278, 12 April 1934, Page 14
Word Count
45Untitled Star (Christchurch), Volume LXVI, Issue 20278, 12 April 1934, Page 14
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.