Article image
Article image
Article image
Article image

BUILDING IN NAPIER.

Many Employed, but More Men Waiting. Per Press Association. NAPIER, June 30. The building operations connected with the. rehabilitation of Napier continue with undiminished intensity. Many, buildings of a value exceeding five figures are at present under construction. Although between 45 and 50 per cent of the cost involved in each structure is absorbed in labour, there is an army of men in the locality waiting to take advantage of ayn work ottering.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/TS19320630.2.5

Bibliographic details

Star (Christchurch), Volume XLIV, Issue 493, 30 June 1932, Page 1

Word Count
76

BUILDING IN NAPIER. Star (Christchurch), Volume XLIV, Issue 493, 30 June 1932, Page 1

BUILDING IN NAPIER. Star (Christchurch), Volume XLIV, Issue 493, 30 June 1932, Page 1