Article image
Article image
Article image
Article image

EXTENSION OF BREAKWATER AT GREYMOUTH. -The tip at the Greymouth Harbour Board’s works showing the double lilies on which runs the pile-driving equipment for the extension of the south breakwater.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/TS19310817.2.92.3

Bibliographic details

Star (Christchurch), Volume XLIV, Issue 194, 17 August 1931, Page 7

Word Count
30

EXTENSION OF BREAKWATER AT GREYMOUTH. -The tip at the Greymouth Harbour Board’s works showing the double lilies on which runs the pile-driving equipment for the extension of the south breakwater. Star (Christchurch), Volume XLIV, Issue 194, 17 August 1931, Page 7

EXTENSION OF BREAKWATER AT GREYMOUTH. -The tip at the Greymouth Harbour Board’s works showing the double lilies on which runs the pile-driving equipment for the extension of the south breakwater. Star (Christchurch), Volume XLIV, Issue 194, 17 August 1931, Page 7