SECOND STAGE OF BRIDGE WORK COMMENCED.— Placing a roadway girder in position on the Sydney Harbour bridge. The girder weighs eighty-nine tons.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19301128.2.44.7
Bibliographic details
Star (Christchurch), Issue 19239, 28 November 1930, Page 5
Word Count
22SECOND STAGE OF BRIDGE WORK COMMENCED.— Placing a roadway girder in position on the Sydney Harbour bridge. The girder weighs eighty-nine tons. Star (Christchurch), Issue 19239, 28 November 1930, Page 5
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.