Article image
Article image
Article image
Article image

TESTS WILL BE MADE AT LAKE COLERIDGE.

The Public Works will be ready for efficiency tests of No. 2 unit at Lake Coleridge about the end of next wtfek. If the tests are successful, this unit will be put into regular serThere has been some delay in making the tests, owing to the fact that special apparatus had to be installed in the pipe-line to measure the flow of water to the turbine, and* owing to the erection of a special water-rheostat to provide an adequate load for the unit.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/TS19300403.2.198

Bibliographic details

Star (Christchurch), Issue 19036, 3 April 1930, Page 1 (Supplement)

Word Count
90

TESTS WILL BE MADE AT LAKE COLERIDGE. Star (Christchurch), Issue 19036, 3 April 1930, Page 1 (Supplement)

TESTS WILL BE MADE AT LAKE COLERIDGE. Star (Christchurch), Issue 19036, 3 April 1930, Page 1 (Supplement)