HEATING BATH WATER. After heating water to bath tern perature you can switch off the electric current and the water in a Merce. Vacuum Electric Cylinder will remain at bath temperature for three days an l three nights. This is due to the Special Lagging used for the Mercei Working demonstrations by J. Mercer i and Sons, Ltd., 54, Oxford Terrace | (near Montreal Street Bridge), Christchurch.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19290615.2.127.20.2
Bibliographic details
Star (Christchurch), Issue 18786, 15 June 1929, Page 22 (Supplement)
Word Count
66Page 22 Advertisements Column 2 Star (Christchurch), Issue 18786, 15 June 1929, Page 22 (Supplement)
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.