Article image
Article image

HEATING BATH WATER. After heating water to bath tern perature you can switch off the electric current and the water in a Merce. Vacuum Electric Cylinder will remain at bath temperature for three days an l three nights. This is due to the Special Lagging used for the Mercei Working demonstrations by J. Mercer i and Sons, Ltd., 54, Oxford Terrace | (near Montreal Street Bridge), Christchurch.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/TS19290615.2.127.20.2

Bibliographic details

Star (Christchurch), Issue 18786, 15 June 1929, Page 22 (Supplement)

Word Count
66

Page 22 Advertisements Column 2 Star (Christchurch), Issue 18786, 15 June 1929, Page 22 (Supplement)

Page 22 Advertisements Column 2 Star (Christchurch), Issue 18786, 15 June 1929, Page 22 (Supplement)