The maximum load at the Lake Coleridge power station during the week ended on Sunday last was 17,600 k.w., recorded between 11.30 and noon on Thursday, compared with 18,460 k.w. in the previous week. At the Addington sub-station the maximum load was 12,240 k.w., recorded between 11 and 1130 a.m. on Thursday, compared with 13,260 k.w. in the previous week. The lake level was 1670 feet and the average inflow from the Harper River was at the rate of 499 cusecs. In the previous week the lake level was 1669.2 feet and the inflow from the Harper River was 533 cusecs.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19281128.2.93
Bibliographic details
Star (Christchurch), Issue 18624, 28 November 1928, Page 9
Word Count
101Untitled Star (Christchurch), Issue 18624, 28 November 1928, Page 9
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.