The section of the Main North Road on the city side of the Belfast Hotel which has been reconstructed in concrete under the main highways scheme has now been completed. It is expected that it will be opened for traffic within a few days; While the worb has been in progress, traffic has been required to use a traick at the side of the road which is passable for vehicles, although in bad order. About half a mile of the road beypnd the Belfast Hotel has : still to. be laid down ui concrete. .
No cold is “NAZOL/’-proof. Highly powerful and penetrating, it goes right to the root of the trouble. Acts like a charm. 60 doses Is 6d, ready for use. o
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19280825.2.87.3
Bibliographic details
Star (Christchurch), Issue 18550, 25 August 1928, Page 6
Word Count
122Page 6 Advertisements Column 3 Star (Christchurch), Issue 18550, 25 August 1928, Page 6
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.