Article image
Article image
Article image
Article image

BUILDING THE BRIDGE.

MUCH WORK COMPLETED. j A great deal of what may be called “spade’’ work has been done in connection with St he Bridge of Remembrance. The whole of the old structure has been removed and considerable progress lias been made with the ferroconcrete work for the new bridge on both banks. An limber of stone masons are busily engaged preparing the stone blocks for the upper work of the bridge. ] The building of the bridge is exrit- \ ing public interest and at any hour of I the day a number of persons may be seen watching the process of firework. There is generally a line of spectators along the temporary footbridge that has been erected across the river.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/TS19230430.2.85

Bibliographic details

Star (Christchurch), Issue 17028, 30 April 1923, Page 8

Word Count
121

BUILDING THE BRIDGE. Star (Christchurch), Issue 17028, 30 April 1923, Page 8

BUILDING THE BRIDGE. Star (Christchurch), Issue 17028, 30 April 1923, Page 8