Article image
Article image
Article image
Article image

NEW SYLVIA.

In the intermediate level, the drive on the reef is 81ft south from the No. .2 rise. The old run of ore has been met ,which, came through when the reef was. first cut in the main orosscnijt at the battery level. In the battery level one stope is in progress between Nos. 2 and 3, and No's. 3 and -t rises. The reef in each case is flft wide, and loots well. Two stoposi aa-e being worked north of N|oi. 4 rise, tliie reef being 2ft wide in each. Two' stopes are hieing worked in the cross reef, with 2ft otf quartz in each. In the low 1 level the crosscut was advanced 13ft, The country in the facie., is of a mild d'esoriptio'n, and about the sain© amount of wiatea' is ooming tliroughi.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/THS19120502.2.53.1

Bibliographic details

Thames Star, Volume XLVII, Issue 10200, 2 May 1912, Page 4

Word Count
137

NEW SYLVIA. Thames Star, Volume XLVII, Issue 10200, 2 May 1912, Page 4

NEW SYLVIA. Thames Star, Volume XLVII, Issue 10200, 2 May 1912, Page 4