DMOANATAIRI.
The chamber at the new or 218-feet level will be finished in a day or two, and
the driving of the south cross-cut to in* fersect No. 9 lode w.ill be commenced immediately. The baling out of the Point Russell winze is now finished, and sinking is now going ahead. There is one hundred feet to sink to connect the winze with the rise from the tunnel. At the 80-feet level a dropper of Wallace's leader, or a branch from the cross-lode has been cut, and is showing gold, freely. Crushing is shaping poorly. McDonald and party have finished crushing for the yield of 66ozs 18dwti
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THS18781203.2.15.2
Bibliographic details
Thames Star, Volume IX, Issue 3058, 3 December 1878, Page 2
Word Count
107DMOANATAIRI. Thames Star, Volume IX, Issue 3058, 3 December 1878, Page 2
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.