CROWN PRINCESS.
The No. 3 ldde has a very proniising appearance at present, and bids fair to turn out well at the next level. T A nice parcel of specimens were secured from this reef on Saturday. On No. 2 reef two winzes have been started, to be ready for opening out when the drive is in from the. bottom of the shaft, sinking of which is now down 12 feet in good country. The result of the crushing at the old Bright Smile mill is satisfactory, 22 head stampers averaging eight days' work, or equal to 150 tons reduced, have returned 220 ounces of retorted gold, The tramway from brace across Pollen street is going up, and probably will be completed in ten days.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THS18750920.2.14.4
Bibliographic details
Thames Star, Volume VII, Issue 2094, 20 September 1875, Page 2
Word Count
125CROWN PRINCESS. Thames Star, Volume VII, Issue 2094, 20 September 1875, Page 2
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.