LONDON’S ROADS
COMPREHENSIVE PLANS FOR RESURFACING British Official wireless RUGBY, October 4. London’s road repairing programme for the next six months Involves the resurfacing of 1,793,000 square yards of carriageway, which is one and a-half times as much as in the corresponding period a year ago. The programme includes the further extension of dual carriageways, along main traffic arteries and also the reconstruction work on the removal of tramway tracks in connection with the substitution on many routes of trolley buses by the London Transport Board.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THD19371007.2.67
Bibliographic details
Timaru Herald, Volume CXLIII, Issue 20852, 7 October 1937, Page 7
Word Count
86LONDON’S ROADS Timaru Herald, Volume CXLIII, Issue 20852, 7 October 1937, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Timaru Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.