Article image
Article image
Article image
Article image

NEW RESERVOIR USELESS

TAIHAPE'S MISFORTUNE. By Telegraph—Press Association TAIHAPE, May 16. The new borough reservoir cracked badly as soon as it was filled and was officially declared to be irreparably damaged. It was built to replace the old reservoir which was cracked and leaking. An engineer has been engaged to report on the old reservoir with a view to bringing it into use again.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/THD19340517.2.79

Bibliographic details

Timaru Herald, Volume CXXXVII, Issue 19801, 17 May 1934, Page 8

Word Count
64

NEW RESERVOIR USELESS Timaru Herald, Volume CXXXVII, Issue 19801, 17 May 1934, Page 8

NEW RESERVOIR USELESS Timaru Herald, Volume CXXXVII, Issue 19801, 17 May 1934, Page 8