Article image
Article image
Article image
Article image
Article image
Article image

THE TAIRUA GOLDFIELD.

■! (FBOM OUB OWN' COBBESPQNDENl I ).' ; '.. Nevesviim Nov. 3rd. ;AjAX.«Tke'low. level drive is now ia 190 feet,,and carrying splendid country; > they expect to intersect the' lode within, the next 60 feet,.which will probably take about another fortnight.; Preparations are now being made to laya tram-road:to the battery, and to lower the quartz floor .18 inches to jgive sufficient room to tip the .quartz, in order to aave every thing'• in readiness for a fair, start when the lode is at hand.. The machinery also requires a ■: little overhauling. :To effect this,, the directors have decided to stop the. battery .. for a few days, and discharge: a number of men. The battery was cloane'd up to---day, after a run of one month and four ' days, for a yield of 216j ounces of retorted gold. The yield, although, not rich/ is ' larger than was expected,.and considered payable. The block of ground from which the late crushing was taken, is nowfinished to the surface, the surface deposit having been much deeper than was antipipaVted.. The amount of payable ground : now taken out, is over 200 feet on, the line of reef, but the richest stono : ovideatly : 'camb out of the main diive, and'as the'reef going downwards appears bettor defined, I think there is every prospect of the ftext. level proving superior to the present one. Taibt/a.—There has been thre¥:"new standards erected for the wire tramway since the stoppage,'and the.manager has,' decided to resume crushing operations/' and to ereofc the remainder at leisure.. The !

battery will commence crushing pa' 1 M.mday next.., Mr Blake, on behalf of Messrs Wright.' and Go.,,is hero engaged in attaching the Gem claim to the company's ground, A tramway is being laid to tho ' Gem tunnel, and operations will bo coni- ; '- mencedto tost tho'value, of this part of tlio company's ground. ' ■ ■: , , Golden Abbow.—l understand: that" the directors are negotiating with tlio Tairua Company to get a crushing before the new ten heads at the' HDairua battery are completed. The manager is opening" out a big face on the Tairua boundary,, ~ and has constructed,a paddook to stpw v the quartz, until the necessary .arrange-;; ment-B are completed. Excollentprospects 5 are obtainable through the stuff, and quite as good as any thing. I have hitliorto. seoa'i in the mine. '> ■ li; ;■ •■- ,' ;

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/THA18761107.2.8

Bibliographic details

Thames Advertiser, Volume IX, Issue 2464, 7 November 1876, Page 2

Word Count
381

THE TAIRUA GOLDFIELD. Thames Advertiser, Volume IX, Issue 2464, 7 November 1876, Page 2

THE TAIRUA GOLDFIELD. Thames Advertiser, Volume IX, Issue 2464, 7 November 1876, Page 2