Article image
Article image
Article image
Article image

TARANAKI OIL FIELDS

REPORT OF OPERATIONS. The report for the week ended August 27 is as follows: Waiapu No. 2 well.—Depth 2150 feet in grey shale. Good showing of gas; SJin. diameter casing to 2140 feet. Water increasing. Gisborne No. 1 well. —No progress lias been made owing to difficulty underreaming; 12Jin. diameter casing now run to bottom. Drilling resumed to-day.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/TDN19270901.2.61

Bibliographic details

Taranaki Daily News, 1 September 1927, Page 7

Word Count
61

TARANAKI OIL FIELDS Taranaki Daily News, 1 September 1927, Page 7

TARANAKI OIL FIELDS Taranaki Daily News, 1 September 1927, Page 7