Article image
Article image
Article image
Article image
Article image
Article image

PORT BUILDING

PROGRESS OF FOUNDATIONS The contractors will start work on the new Port Building: on the waterfront on October 1. The foundations are being prepared by the Auckland Harbour Board. Twenty-six uf the 69 piles have al-

ready been driven and good progrfl£ has been made with all work ated with the foundations. . It is expected that the first pori of the building, for which the _ ten was let, will be completed in months.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/SUNAK19300915.2.159

Bibliographic details

Sun (Auckland), Volume IV, Issue 1077, 15 September 1930, Page 14

Word Count
75

PORT BUILDING Sun (Auckland), Volume IV, Issue 1077, 15 September 1930, Page 14

PORT BUILDING Sun (Auckland), Volume IV, Issue 1077, 15 September 1930, Page 14