Article image
Article image
Article image
Article image

LINKING PARNELL AND ORAKEI.—The construction of the footbridge from the new waterfront road to Point Resolution across the railway line and the channel which connects Judge’s Bay with Hobson’s Bay, is well under wa y. The two concrete towers which will carry the bridge are already taking shape.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/SUNAK19290418.2.163.6

Bibliographic details

Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 16

Word Count
48

LINKING PARNELL AND ORAKEI.—The construction of the footbridge from the new waterfront road to Point Resolution across the railway line and the channel which connects Judge’s Bay with Hobson’s Bay, is well under way. The two concrete towers which will carry the bridge are already taking shape. Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 16

LINKING PARNELL AND ORAKEI.—The construction of the footbridge from the new waterfront road to Point Resolution across the railway line and the channel which connects Judge’s Bay with Hobson’s Bay, is well under way. The two concrete towers which will carry the bridge are already taking shape. Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 16