Article image
Article image

TARANAKI OILFIELDS REPORT.— The Waiapu No. 2 well is drilled to 1.565 feet, with ten-inch casing to 1,818 feet. A hard band of shale at 1,850 feet retarded progress. The GTsborne No. 1 well rigging is up: the buUwork is delayed by had weather.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/SUNAK19270705.2.30.3

Bibliographic details

Sun (Auckland), Volume 1, Issue 88, 5 July 1927, Page 2

Word Count
44

Page 2 Advertisements Column 3 Sun (Auckland), Volume 1, Issue 88, 5 July 1927, Page 2

Page 2 Advertisements Column 3 Sun (Auckland), Volume 1, Issue 88, 5 July 1927, Page 2