NEW WORKSHOPS
WORK AT OTAHUHU Half the foundations of the new railway workshops at Otaliuhu have been completed. The contractors have been delayed through the non-arrival of steel from England, but the first shipment is expected at the middle of July. Construction of the workshops will be proceeded with immediately.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19270702.2.36
Bibliographic details
Sun (Auckland), Volume 1, Issue 86, 2 July 1927, Page 4
Word Count
50NEW WORKSHOPS Sun (Auckland), Volume 1, Issue 86, 2 July 1927, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.