Article image
Article image
Article image
Article image

THE 3rd FIELD COMPANY, NEW ZEALAND ENGINEERS carrying out manoeuvres recently. Left: A pontoon bridge constructed over the Avon in 40 minutes. Centre: Firing a heavy charge. Right: Erecting barbed wire entanglements.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/ST19400615.2.87.2

Bibliographic details

Southland Times, Issue 24153, 15 June 1940, Page 10

Word Count
32

THE 3rd FIELD COMPANY, NEW ZEALAND ENGINEERS carrying out manoeuvres recently. Left: A pontoon bridge constructed over the Avon in 40 minutes. Centre: Firing a heavy charge. Right: Erecting barbed wire entanglements. Southland Times, Issue 24153, 15 June 1940, Page 10

THE 3rd FIELD COMPANY, NEW ZEALAND ENGINEERS carrying out manoeuvres recently. Left: A pontoon bridge constructed over the Avon in 40 minutes. Centre: Firing a heavy charge. Right: Erecting barbed wire entanglements. Southland Times, Issue 24153, 15 June 1940, Page 10