Because the Central London railway station at Chancery Lane is being rebuilt, 100 telephone cables, carrying 70,000 lines, will have to be diverted and replaced. The work will require nearly a year to complete, alternative lines being used meanwhile.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ST19331227.2.92.1
Bibliographic details
Southland Times, Issue 22207, 27 December 1933, Page 9
Word Count
39Page 9 Advertisements Column 1 Southland Times, Issue 22207, 27 December 1933, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Southland Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.