The work of removing the coffer dum from the headrace at Arapuiii has been completed and the. diversion tunnel has iSto closed. All requirements for power : iSr© tnet without calling on auxiliary plants. The Waikato River was at a very low level on Friday. hfiwfe; .
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/PBH19321130.2.122
Bibliographic details
Poverty Bay Herald, Volume LIX, Issue 17950, 30 November 1932, Page 11
Word Count
45Untitled Poverty Bay Herald, Volume LIX, Issue 17950, 30 November 1932, Page 11
Using This Item
The Gisborne Herald Company is the copyright owner for the Poverty Bay Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.