Article image
Article image
Article image
Article image
Article image
Article image

THE THIRD DAM.

SHORTAGE AT MANGAHAO

(Per Piess Association.) WELLINGTON, this day. ! Owing to the scanty rainfall the A 1 .in- | gahao power system is affected. The | level of the water in the dam lias been l falling, and a call has now becm made on the Evans' Bay city station ;:nd the Palmerston North station to assist at the heaviest periods.. The big increase of consumption has] brought tho demand on Mangahao np to the capacity of the plant. This will be ! relieved w'iu'.i. thrt third dam is completed. A.Public Works Department official states that there is no occasion for alarm. Assistance will only be required during peak loads.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/PBH19260611.2.85

Bibliographic details

Poverty Bay Herald, Volume LII, Issue 17057, 11 June 1926, Page 9

Word Count
110

THE THIRD DAM. Poverty Bay Herald, Volume LII, Issue 17057, 11 June 1926, Page 9

THE THIRD DAM. Poverty Bay Herald, Volume LII, Issue 17057, 11 June 1926, Page 9