Article image
Article image
Article image
Article image

THE BOWS OF THE WHALER. The upper structure is drawn inboard; the lower portion swings outwards and uncovers a tunnel 20ft in diameter, through which the whales are hauled up for flensing.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/OW19280306.2.176.3

Bibliographic details

Otago Witness, Issue 3860, 6 March 1928, Page 44

Word Count
32

THE BOWS OF THE WHALER. The upper structure is drawn inboard; the lower portion swings outwards and uncovers a tunnel 20ft in diameter, through which the whales are hauled up for flensing. Otago Witness, Issue 3860, 6 March 1928, Page 44

THE BOWS OF THE WHALER. The upper structure is drawn inboard; the lower portion swings outwards and uncovers a tunnel 20ft in diameter, through which the whales are hauled up for flensing. Otago Witness, Issue 3860, 6 March 1928, Page 44