Notes from Waikaia.
(Fkom Oub Own Coerkspoxdent ) WAIKAIA, October 4 The Axgyle dredge has been stopped for over a %v<*k waiting for a top tumbler bar to pe-plaoe the one which \\a^ broken. The Bonnie Dundee dredge i.« working very steadily, and rs owning- out to tlio full width of the claim. It is reported that the company is getting working p.vpen-e 1 -. The Mystery Flat dredge brok^ hor lx>ttom tumbler on Saturday, but a, the necessary parts are on the ground the dred"M3 will not b' stopped very lone. The Muddy Creek Xo. 2 drec l ge is «till working a narrow strip up along the Masi terton bouiidarj.
The Kia-Ora dredge has stopped op^ratoins.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW19091006.2.114.6
Bibliographic details
Otago Witness, Volume 06, Issue 2899, 6 October 1909, Page 29
Word Count
116Notes from Waikaia. Otago Witness, Volume 06, Issue 2899, 6 October 1909, Page 29
Using This Item
Allied Press Ltd is the copyright owner for the Otago Witness. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.