Article image
Article image
Article image
Article image
Article image
Article image

Notes from Waikaia.

(Fkom Oub Own Coerkspoxdent ) WAIKAIA, October 4 The Axgyle dredge has been stopped for over a %v<*k waiting for a top tumbler bar to pe-plaoe the one which \\a^ broken. The Bonnie Dundee dredge i.« working very steadily, and rs owning- out to tlio full width of the claim. It is reported that the company is getting working p.vpen-e 1 -. The Mystery Flat dredge brok^ hor lx>ttom tumbler on Saturday, but a, the necessary parts are on the ground the dred"M3 will not b' stopped very lone. The Muddy Creek Xo. 2 drec l ge is «till working a narrow strip up along the Masi terton bouiidarj.

The Kia-Ora dredge has stopped op^ratoins.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/OW19091006.2.114.6

Bibliographic details

Otago Witness, Volume 06, Issue 2899, 6 October 1909, Page 29

Word Count
116

Notes from Waikaia. Otago Witness, Volume 06, Issue 2899, 6 October 1909, Page 29

Notes from Waikaia. Otago Witness, Volume 06, Issue 2899, 6 October 1909, Page 29