Work is at present in progress on the resurfacing of the training track and the inner half of the racing track at Forbury Park. The photograph shows the mechanical loader and other machines which are being used.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ODT19460709.2.102.4.1
Bibliographic details
Otago Daily Times, Issue 26199, 9 July 1946, Page 7
Word Count
37Work is at present in progress on the resurfacing of the training track and the inner half of the racing track at Forbury Park. The photograph shows the mechanical loader and other machines which are being used. Otago Daily Times, Issue 26199, 9 July 1946, Page 7
Using This Item
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.