LENGTHENING BRIDGE OVER LEITH CANAL The Otago Harbour Board's scheme for widening the Water of Leith has necessitated the lengthening of the bridge in Anzac avenue to span the width of the new canal and work on this project is now being carried on.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ODT19360307.2.41.3
Bibliographic details
Otago Daily Times, Issue 22824, 7 March 1936, Page 8
Word Count
44LENGTHENING BRIDGE OVER LEITH CANAL The Otago Harbour Board's scheme for widening the Water of Leith has necessitated the lengthening of the bridge in Anzac avenue to span the width of the new canal and work on this project is now being carried on. Otago Daily Times, Issue 22824, 7 March 1936, Page 8
Using This Item
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.