Article image
Article image
Article image
Article image

MINING.

TARANAKI OILFIELDS. REPORT OF DRILLINGS. (Pkb Ukitct* Pat km Asjocsatios.) NEW PLYMOUTH, JaaranTT 13, The Taranaki Oilfields repart that the Tarata bore baa been drilled to 4160 ft in abale, to set an Sfin easily on the bottom preparatory to cementing. The Motruroa bore has been drilled to 3210 ft in shale, slightly harder drilling, to straighten the hole preparatory to ruts, ning 6|in casing again.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/ODT19260114.2.95

Bibliographic details

Otago Daily Times, Issue 19687, 14 January 1926, Page 13

Word Count
67

MINING. Otago Daily Times, Issue 19687, 14 January 1926, Page 13

MINING. Otago Daily Times, Issue 19687, 14 January 1926, Page 13