LONDON WATER SUPPLY
HUGE PROGRESSIVE SCHEME O'TJTLIN ED. 8y Teleeraph—Press Association—Copyrifrht. LOJTDON', March 13. The London Water Board proposes to carry out a scheme, costing £6,200,000, to supply London with water until 1941.. when, a scheme for the supply of 420,000,000 gallons may he required. The latter would give thirty-five gallons daily for each of 12.000,000 people.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZTIM19100315.2.11
Bibliographic details
New Zealand Times, Volume XXXII, Issue 7077, 15 March 1910, Page 1
Word Count
57LONDON WATER SUPPLY New Zealand Times, Volume XXXII, Issue 7077, 15 March 1910, Page 1
Using This Item
Stuff Ltd is the copyright owner for the New Zealand Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.