Article image
Article image
Article image
Article image
Article image
Article image

MINING YIELDS

Argo (West Coast). —For period ended December 2t, a total of (JToz. from 18,000 vards in 171 hours. , ' Big River (Reet'ton). —From November 22 a total of 120 tons crushed for lo3oz. melted gold and 200 tons of sands treated for SO -ox. bullion; total estimated value at au nz. £1455. In addition l'/ 2 tons of concentrates were saved valued at i.">o.

SLUICING IN AUSTRALIA A sluicing plan put into operation at the mine of Sunshine Cold Development, Limited, Sydney, was producing entirely satisfactory results, said the chairman, Mr. F. \V. Torrmgton, at the annual meeting. The company was faced with a serious labour problem because of the difficulty in obtaining, experienced Europeans. Most of the skilled operatives had been drawn from New Zealand, bat this source was now closed.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19401230.2.18

Bibliographic details

New Zealand Herald, Volume LXXVII, Issue 23851, 30 December 1940, Page 3

Word Count
133

MINING YIELDS New Zealand Herald, Volume LXXVII, Issue 23851, 30 December 1940, Page 3

MINING YIELDS New Zealand Herald, Volume LXXVII, Issue 23851, 30 December 1940, Page 3