OFFICIAL OPENING OF THE FINE NEW BRIDGE CONSTRUCTED ACROSS THE TOWN WHARF BASIN AT WHANGAREI Left: A view during the opening ceremony on Tuesday afternoon. The old structure, which has been in use since 1898, appears on the left. Right: The Mayoress of Whangarei, Mrs. W. Jones, cuts the ribbon with the assistance of the Mayor, Mr. W. Jones, and the Town Clerk, Mr. L. Hall. The new bridge, which has been built at a total cost of about £B9OO, spans the Hatea River at the town wharf basin, at the commencement of the road leading along the shores of the harbour to Onerahi and the Whangarei Heads.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19361112.2.28.7
Bibliographic details
New Zealand Herald, Volume LXXIII, Issue 22574, 12 November 1936, Page 10
Word Count
108OFFICIAL OPENING OF THE FINE NEW BRIDGE CONSTRUCTED ACROSS THE TOWN WHARF BASIN AT WHANGAREI Left: A view during the opening ceremony on Tuesday afternoon. The old structure, which has been in use since 1898, appears on the left. Right: The Mayoress of Whangarei, Mrs. W. Jones, cuts the ribbon with the assistance of the Mayor, Mr. W. Jones, and the Town Clerk, Mr. L. Hall. The new bridge, which has been built at a total cost of about £B9OO, spans the Hatea River at the town wharf basin, at the commencement of the road leading along the shores of the harbour to Onerahi and the Whangarei Heads. New Zealand Herald, Volume LXXIII, Issue 22574, 12 November 1936, Page 10
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.