Article image
Article image
Article image
Article image

FIRST BOWSTRING ARCH BRIDGE TO BE CONSTRUCTED IN THE WAITEMATA COUNTY This new concrete bridge replaces an old wooden structure over the Makarau River between Kaukapakapa and Port Albert. The cost of the bridge, which has a total length of 222 ft., was approximately £3500.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19360613.2.26.6

Bibliographic details

New Zealand Herald, Volume LXXIII, Issue 22444, 13 June 1936, Page 10

Word Count
45

FIRST BOWSTRING ARCH BRIDGE TO BE CONSTRUCTED IN THE WAITEMATA COUNTY This new concrete bridge replaces an old wooden structure over the Makarau River between Kaukapakapa and Port Albert. The cost of the bridge, which has a total length of 222 ft., was approximately £3500. New Zealand Herald, Volume LXXIII, Issue 22444, 13 June 1936, Page 10

FIRST BOWSTRING ARCH BRIDGE TO BE CONSTRUCTED IN THE WAITEMATA COUNTY This new concrete bridge replaces an old wooden structure over the Makarau River between Kaukapakapa and Port Albert. The cost of the bridge, which has a total length of 222 ft., was approximately £3500. New Zealand Herald, Volume LXXIII, Issue 22444, 13 June 1936, Page 10