Article image
Article image
Article image
Article image

MINING NEWS

REPORTS OF MANAGERS afSlShlT < Reß «°")-The mine reopened after the Easter holidays on April 15. pairs to the mam shaft above No, 2 chami « Bre -.L n pr ° gres ?- ?'he relining of ths shaft with end and side plates has been completed to a point 18ft above the cap of .No. 2 .evel chamber. In this section, to No. 1 intermediate level (about 70ft) has yet to be completed. On Cosgrove's block repairs to the rise have been completed, and this section ia now ready for further prospecting work. The bottom of the dam wall below silt level has been completed fof the full width of the dam. The balance o] the repair work will not be so dependent on dry weather conditions.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19360430.2.24

Bibliographic details

New Zealand Herald, Volume LXXIII, Issue 22406, 30 April 1936, Page 7

Word Count
125

MINING NEWS New Zealand Herald, Volume LXXIII, Issue 22406, 30 April 1936, Page 7

MINING NEWS New Zealand Herald, Volume LXXIII, Issue 22406, 30 April 1936, Page 7