Article image
Article image
Article image
Article image

DAMAGE TO ROADS

MAN G ON UI COUNTY EFFECT OF RECENT FLOODS [BY TELEGRAPH —OWN CORRESPONDENT] KAITAIA, "Wednesday 0 A survey of the damage done to roads in the Mangonui County through the recent floods has now been made by the county engineer, and an application to the Government for a special grant to repair the damage has been forwarded. The total cost is estimated at £550. Of this, £3OO is for the Kohumarn Road, which suffered the greatest damage. Duncan Itoad will take £l5O to repair. A bridge over the Kaitaia River has collapsed owing to the flood undermining the banks. The bridge was 60ft-. long, but , if rebuilt will require to be 'Boft., and the cost will be nearly £SOO.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19340705.2.141

Bibliographic details

New Zealand Herald, Volume LXXI, Issue 21844, 5 July 1934, Page 15

Word Count
122

DAMAGE TO ROADS New Zealand Herald, Volume LXXI, Issue 21844, 5 July 1934, Page 15

DAMAGE TO ROADS New Zealand Herald, Volume LXXI, Issue 21844, 5 July 1934, Page 15