Article image
Article image
Article image
Article image

AN IMPORTANT WORK AT ARAPUNI: NEW SLUICE GATE FOR THE DIVERSION TUNNEL BEING ERECTED An hydaulic cylinder, weighing 10 tons, being placed in position at the Arapuni hydro-electric works this week. The cylinder forms part of the gear for lifting the new sluice gate which is being erected in the diversion tunnel underneath.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19330615.2.27.5

Bibliographic details

New Zealand Herald, Volume LXX, Issue 21518, 15 June 1933, Page 8

Word Count
53

AN IMPORTANT WORK AT ARAPUNI: NEW SLUICE GATE FOR THE DIVERSION TUNNEL BEING ERECTED An hydaulic cylinder, weighing 10 tons, being placed in position at the Arapuni hydro-electric works this week. The cylinder forms part of the gear for lifting the new sluice gate which is being erected in the diversion tunnel underneath. New Zealand Herald, Volume LXX, Issue 21518, 15 June 1933, Page 8

AN IMPORTANT WORK AT ARAPUNI: NEW SLUICE GATE FOR THE DIVERSION TUNNEL BEING ERECTED An hydaulic cylinder, weighing 10 tons, being placed in position at the Arapuni hydro-electric works this week. The cylinder forms part of the gear for lifting the new sluice gate which is being erected in the diversion tunnel underneath. New Zealand Herald, Volume LXX, Issue 21518, 15 June 1933, Page 8