Article image
Article image
Article image
Article image

MODERN METHODS EMPLOYED IN THE GIGANTIC TASK OF RECONSTRUCTION AT ARAPUNI. Top: A mechanical shovel in operation, trimming the banks of the spillway for concreting purposes. This machine covers an extensive area in a very short time. Lower: Spraying the banks of the headrace with liquid c.ement.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19310511.2.19.7

Bibliographic details

New Zealand Herald, Volume LXVIII, Issue 20869, 11 May 1931, Page 6

Word Count
47

MODERN METHODS EMPLOYED IN THE GIGANTIC TASK OF RECONSTRUCTION AT ARAPUNI. Top: A mechanical shovel in operation, trimming the banks of the spillway for concreting purposes. This machine covers an extensive area in a very short time. Lower: Spraying the banks of the headrace with liquid c.ement. New Zealand Herald, Volume LXVIII, Issue 20869, 11 May 1931, Page 6

MODERN METHODS EMPLOYED IN THE GIGANTIC TASK OF RECONSTRUCTION AT ARAPUNI. Top: A mechanical shovel in operation, trimming the banks of the spillway for concreting purposes. This machine covers an extensive area in a very short time. Lower: Spraying the banks of the headrace with liquid c.ement. New Zealand Herald, Volume LXVIII, Issue 20869, 11 May 1931, Page 6