Article image
Article image
Article image
Article image

' AUCKLAND CITY'S WATER SUPPLY: CONSTRUCTING A NEW HIGH - LEVEL RESERVOIR ON MOUNT EDEN. This photograph show, the progress of work on the new concrete reservoir. It will have a capacity of 3,500,000 gallon., considerably greater than that of the old structure. The cost is in excess of *l*soo.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19290514.2.111

Bibliographic details

New Zealand Herald, Volume LXVI, Issue 20254, 14 May 1929, Page 11

Word Count
48

' AUCKLAND CITY'S WATER SUPPLY: CONSTRUCTING A NEW HIGH – LEVEL RESERVOIR ON MOUNT EDEN. This photograph show, the progress of work on the new concrete reservoir. It will have a capacity of 3,500,000 gallon., considerably greater than that of the old structure. The cost is in excess of *l*soo. New Zealand Herald, Volume LXVI, Issue 20254, 14 May 1929, Page 11

' AUCKLAND CITY'S WATER SUPPLY: CONSTRUCTING A NEW HIGH – LEVEL RESERVOIR ON MOUNT EDEN. This photograph show, the progress of work on the new concrete reservoir. It will have a capacity of 3,500,000 gallon., considerably greater than that of the old structure. The cost is in excess of *l*soo. New Zealand Herald, Volume LXVI, Issue 20254, 14 May 1929, Page 11