Article image
Article image
Article image
Article image

TEMPORARY REPAIRS TO THE MOUNT EDEN RESERVOIR NOW BEING CARRIED OUT. In order to assure a steady supply of water, the wall of the old reservoir, which burst on Monday snorning, is being replaced by § temporary brick structure,.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19290308.2.136

Bibliographic details

New Zealand Herald, Volume LXVI, Issue 20199, 8 March 1929, Page 13

Word Count
38

TEMPORARY REPAIRS TO THE MOUNT EDEN RESERVOIR NOW BEING CARRIED OUT. In order to assure a steady supply of water, the wall of the old reservoir, which burst on Monday snorning, is being replaced by § temporary brick structure,. New Zealand Herald, Volume LXVI, Issue 20199, 8 March 1929, Page 13

TEMPORARY REPAIRS TO THE MOUNT EDEN RESERVOIR NOW BEING CARRIED OUT. In order to assure a steady supply of water, the wall of the old reservoir, which burst on Monday snorning, is being replaced by § temporary brick structure,. New Zealand Herald, Volume LXVI, Issue 20199, 8 March 1929, Page 13