Article image
Article image
Article image
Article image

OVERCOMING THE SHORTAGE CAUSED BY ARAPUNI'S DELAY. One of the three Diesel oil engines at the Penrose sub-station, which have commenced generating electric-power which was delivered to the Auckland system for the first lime yesterday.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19280602.2.11.11

Bibliographic details

New Zealand Herald, Volume LXV, Issue 19962, 2 June 1928, Page 8

Word Count
35

OVERCOMING THE SHORTAGE CAUSED BY ARAPUNI'S DELAY. One of the three Diesel oil engines at the Penrose sub-station, which have commenced generating electric-power which was delivered to the Auckland system for the first lime yesterday. New Zealand Herald, Volume LXV, Issue 19962, 2 June 1928, Page 8

OVERCOMING THE SHORTAGE CAUSED BY ARAPUNI'S DELAY. One of the three Diesel oil engines at the Penrose sub-station, which have commenced generating electric-power which was delivered to the Auckland system for the first lime yesterday. New Zealand Herald, Volume LXV, Issue 19962, 2 June 1928, Page 8