Article image
Article image
Article image
Article image

THE GRAFTON BRIDGE.

— | REPAIR WORK COMMENCES. ! . Kearly half the old asphalt surface of Grafton Bridge had beoii torn up before sunset last evening in connection with the repaying which has to be completed this week The gang continued working in the evening by lamp light, and a short section of new asphalt was laid at the Grafton Road end of the bridge. Over 300 tons of material will L» required for J the new surfacing.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19270503.2.42

Bibliographic details

New Zealand Herald, Volume LXIV, Issue 19626, 3 May 1927, Page 8

Word Count
75

THE GRAFTON BRIDGE. New Zealand Herald, Volume LXIV, Issue 19626, 3 May 1927, Page 8

THE GRAFTON BRIDGE. New Zealand Herald, Volume LXIV, Issue 19626, 3 May 1927, Page 8