Article image
Article image
Article image
Article image

WONDERFUL • SUCCESS OF TEMPORARY DAM •AT ARAPUNI. View of the gorge showing the gabion dam, which has just been completed below the intake oi : the diversion tunnel. A similar dam is being constructed above the outlet, and when both are made tight the water will be pumped oat, rendering this section of the river-bed dry for the building of the main dam.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19260828.2.99.5

Bibliographic details

New Zealand Herald, Volume LXIII, Issue 19418, 28 August 1926, Page 13

Word Count
62

WONDERFUL • SUCCESS OF TEMPORARY DAM •AT ARAPUNI. View of the gorge showing the gabion dam, which has just been completed below the intake oi: the diversion tunnel. A similar dam is being constructed above the outlet, and when both are made tight the water will be pumped oat, rendering this section of the river-bed dry for the building of the main dam. New Zealand Herald, Volume LXIII, Issue 19418, 28 August 1926, Page 13

WONDERFUL • SUCCESS OF TEMPORARY DAM •AT ARAPUNI. View of the gorge showing the gabion dam, which has just been completed below the intake oi: the diversion tunnel. A similar dam is being constructed above the outlet, and when both are made tight the water will be pumped oat, rendering this section of the river-bed dry for the building of the main dam. New Zealand Herald, Volume LXIII, Issue 19418, 28 August 1926, Page 13