WATER POWER SCHEMES.
WORK AT LAKE COLERIDGE.
[BY TELEGRAPH.PRESS ASSOCIATION.] Chkistchttbch, Monday. THE'members of the City Council visited ■the Lake Coleridge hydro-electric construction, works to-day, and were greatly disappointed at the small progress made. It -was explained that the necessary preliminary works were being undertaken, and that a. start was- to be made forthwith with the boring of ths tunnel from the lake to the Rakaia River.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19111024.2.73
Bibliographic details
New Zealand Herald, Volume XLVIII, Issue 14819, 24 October 1911, Page 8
Word Count
67WATER POWER SCHEMES. New Zealand Herald, Volume XLVIII, Issue 14819, 24 October 1911, Page 8
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.