Article image
Article image
Article image
Article image
Article image
Article image

WATER POWER SCHEMES.

WORK AT LAKE COLERIDGE.

[BY TELEGRAPH.PRESS ASSOCIATION.] Chkistchttbch, Monday. THE'members of the City Council visited ■the Lake Coleridge hydro-electric construction, works to-day, and were greatly disappointed at the small progress made. It -was explained that the necessary preliminary works were being undertaken, and that a. start was- to be made forthwith with the boring of ths tunnel from the lake to the Rakaia River.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19111024.2.73

Bibliographic details

New Zealand Herald, Volume XLVIII, Issue 14819, 24 October 1911, Page 8

Word Count
67

WATER POWER SCHEMES. New Zealand Herald, Volume XLVIII, Issue 14819, 24 October 1911, Page 8

WATER POWER SCHEMES. New Zealand Herald, Volume XLVIII, Issue 14819, 24 October 1911, Page 8