DREDGING RETURN
•llnite>l Press Association) GREYMOUTH, 29th June. The Mossy Creek dredge returned 50oz 17dwt for 199 hours from 8560 yards. The dredge was beached yesterday to enable the pontoons to be overhauled.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NEM19390630.2.120
Bibliographic details
Nelson Evening Mail, Volume LXXIII, 30 June 1939, Page 9
Word Count
33DREDGING RETURN Nelson Evening Mail, Volume LXXIII, 30 June 1939, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Nelson Evening Mail. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.