TOTANGI BORE
SLOW PROGRESS IN DRILLING (United Press Association! GISBORNE. This Day. The New Zealand Petroleum Co., advises that progress in drilling the Totangi bore during the week has been slow on account of the nature of the rock being penetrated. The bore reached a depth of 4040 feet.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NEM19390511.2.40
Bibliographic details
Nelson Evening Mail, Volume LXXIII, 11 May 1939, Page 6
Word Count
49TOTANGI BORE Nelson Evening Mail, Volume LXXIII, 11 May 1939, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Nelson Evening Mail. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.