Article image
Article image
Article image
Article image

TOTANGI BORE

SLOW PROGRESS IN DRILLING (United Press Association! GISBORNE. This Day. The New Zealand Petroleum Co., advises that progress in drilling the Totangi bore during the week has been slow on account of the nature of the rock being penetrated. The bore reached a depth of 4040 feet.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NEM19390511.2.40

Bibliographic details

Nelson Evening Mail, Volume LXXIII, 11 May 1939, Page 6

Word Count
49

TOTANGI BORE Nelson Evening Mail, Volume LXXIII, 11 May 1939, Page 6

TOTANGI BORE Nelson Evening Mail, Volume LXXIII, 11 May 1939, Page 6