Article image
Article image
Article image
Article image

MINING

NEMONA Owing to short working hours and the dredging ground becoming shallow there was no clean-up last week by the Nemona Company. WORKSOP EXTENDED Return of Worksop Extended Gold Dredging Co. Ltd., for the week ending 24 November: 36 ounces, 127 hours, 9.000 yards. Report of Big River Gold Mines Limited for the week ending 25th November:—No. 5 Level: North stope, filling stope. North Stope south end, stone 3ft in width and appears to be lengthening. Winze: Preparing to sink below No. 5 level north end. No. 6 Level: Advanced 15 feet. Number of small leaders in the face. Battery: 40 tons of stone sent to the battery.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NEM19381128.2.22

Bibliographic details

Nelson Evening Mail, Volume LXXII, 28 November 1938, Page 4

Word Count
109

MINING Nelson Evening Mail, Volume LXXII, 28 November 1938, Page 4

MINING Nelson Evening Mail, Volume LXXII, 28 November 1938, Page 4