Article image
Article image
Article image
Article image

PORT OF LONDON AUTHORITY

CONSTRUCTION OF BARRAGE ACROSS THAMES INQUIRY SUSPENDED (Britiio Official Wireless) RUGBY, 28th March. The Port of London Authority has suspended the inquiry recently begun into the construction of a barrage across the Thames within the Port of London for the purpose of the creation of a non-tidal waterway through the centre of the metropolis. The inquiry would serve no useful purpose in view of the opinion of the Imperial Defence Committee communicated by the Minister of Transport, Mr E. L. Burgin, that such a barrage would have serious disadvantages and of the Minister’s statement that the Government would therefore be compelled to veto any such project.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NEM19380330.2.63

Bibliographic details

Nelson Evening Mail, Volume LXXI, 30 March 1938, Page 7

Word Count
110

PORT OF LONDON AUTHORITY Nelson Evening Mail, Volume LXXI, 30 March 1938, Page 7

PORT OF LONDON AUTHORITY Nelson Evening Mail, Volume LXXI, 30 March 1938, Page 7