Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

MINING

BIG RIVER GOLD MINES LIMITED

Report for week ending 14th September, 1936. No. 4 Level: Stoping operations are in progress in the North stope, centre stope and south stope. In the stope north of main ■rise timbering aria filling in old workings is being carried out in one shift.

No. 5 Level: The crosscut has been extended 18 feet for week, making 98 feet for main shaft. Forty-seven ton:- of ore have been brought to the surface, and battery is crushing one shift daily.

WORKSOP EXTENDED GOLD DREDGING CO. LTD.

The following is the official return for week ending 17th September, 19'. : 6: Yield 26 ounces, hours dredged 130, yardage treated 9,600.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NEM19360921.2.101

Bibliographic details

Nelson Evening Mail, Volume LXX, 21 September 1936, Page 7

Word Count
113

MINING Nelson Evening Mail, Volume LXX, 21 September 1936, Page 7

MINING Nelson Evening Mail, Volume LXX, 21 September 1936, Page 7