BRIAN BORU DREDGE
(By Telegraph—Press Association) GREYMOUTH, This Day. The Brian Bom dredge weekly return is 39ozs for 94 hours’ working. The dredge stopped on Friday last for'repairs to,,the screen roller, expected to be completed, by tlie dredge resuming working -on-Thursday- morning. It“ is . pvo.bable. there MilL b0,,’.'.h0 wash-uo this week.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NEM19330821.2.80
Bibliographic details
Nelson Evening Mail, Volume LXVI, 21 August 1933, Page 5
Word Count
51BRIAN BORU DREDGE Nelson Evening Mail, Volume LXVI, 21 August 1933, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Nelson Evening Mail. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.