Article image
Article image
Article image
Article image

MINING NEWS

PRODUCTION RETURNS. Golden Sands (Barrytown).—73oz. 19 dwts. for 48 shifts of 8 hours each. Bell Hill (Ahauta). —A wash-up on March 30 yielded 3Soz. from 17 days’ sluicing, STRIKE AT ALEXANDER, Alexander Minos, Ltd, (Pcefton), reports that owing to the strike of employees, no work was carried out in the mine, during March. The staff was employed on the lower excavation for the powerhouse, and installing the machinery for working the rabblors and selffeeding apparatus for the new oreroasting furnace, MANAGER’S REPORT. Mataki (Murchison). —The dredge continues to work well, although the ground is very tight. It carries fair gold right across the cut, with the river portion showing a (greater percentage of gold than the flat. E. S. AND A. BANK INTERIM DIVIDEND. The directors of the English, Scottish and Australian Bank, Ltd., have declared an interim dividend unchanged at 2h per cent., free of British income tax.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NA19340409.2.95.4

Bibliographic details

Northern Advocate, 9 April 1934, Page 10

Word Count
151

MINING NEWS Northern Advocate, 9 April 1934, Page 10

MINING NEWS Northern Advocate, 9 April 1934, Page 10